| TOO MUCH | – | use DDP to plan how to reduce risk in a cost-effective manner |
| TOO LITTLE | – | use DDP to plan how to accept more risk in exchange for reduced cost and schedule, more functionality, etc. |
| JUST RIGHT | – | use DDP to maintain a desired risk profile through the lifetime of the project. |
| DON'T KNOW | – | use DDP to assess risk status. |