GOT RISK?


TOO MUCH  –  use DDP to plan how to reduce risk in a cost-effective manner
TOO LITTLE  –  use DDP to plan how to accept more risk in exchange for reduced cost and schedule, more functionality, etc.
JUST RIGHT  –  use DDP to maintain a desired risk profile through the lifetime of the project.
DON'T KNOW  –  use DDP to assess risk status.

 
 
 
 

  Privacy/Copyright

Last update 10/30/07    WebMaster Martin Feather
Jet Propulsion Laboratory, California Institute of Technology
Sponsored by Collaborative Engineering Project, JPL